Management of information & know
how

Some facts
-
About 80 % of all
activities in an engineering department relate to equal or quasi-equal
previous made constructions (study by Arthur D. Little).
-
Up to about 15 % of all designing time is dedicated
to the search for information whereof one knows it exists, but that cannot
be found because it has not been structured in a logical way. CIMData
thinks this time requires 60 % or more.
-
Trend towards teamwork instead of ‘stand alone’.
This can only be successful when all information is unambiguous and
directly accessible to all team members.
Therefore it is important that you manage all
engineering and other related information in a safe and orderly way.
PDM: the SAVACO experience
Through the years, SAVACO has obtained a lot of
experience in the setting up of a PDM system and the coupling with ERP.
Depending on your situation we will propose Pro/INTRALINK or Windchill PDMLink.
More information on Pro/INTRALINK on the PTC website.
More information on Windchill PDMLink on the PTC website.
|